Orange County NC Website
Quote #: 00045934 <br />1.800.838.7927 | dc-group.com <br /> <br />DCG-QPM-FRM0004 05/22/2023 <br /> <br />ADDITIONAL COMMENTS <br />Additional Notes: On first Major Performance Inspection, all parts and labor required to cause the unit(s) under contract to meet manufacturer's specifications will be <br />quoted to Company. If a particular model of equipment has been discontinued or placed on end of life status by a manufacturer DC Group will use its best effort to obtain <br />parts but cannot guarantee the availability thereof. <br />Wet Cell Batteries: This Proposal for Service is not valid for wet-cell batteries unless specifically noted. <br />Site Sentry: In order to connect the customer’s UPS unit to Site SentryTM, the UPS must have an SNMP card installed and programmed, along with necessary connection <br />equipment, when the DC Group Field Service Engineer arrives on-site. If any parts or additional labor is required to set up Site SentryTM, the customer will be quoted and <br />billed separately. <br />If a price is shown for multiple items it is a composite price and shall not be construed as a line item price. If a line item price is required it should be separately requested <br />and it will be identified as such. <br />All DC Group Standard Terms and Conditions are applicable with this Proposal for Service and resulting Contract. <br />The pricing on this Proposal for Service is valid for a period of 180 days from the Created Date, and does not include all applicable taxes or shipping and handling costs, <br />unless otherwise noted. <br />Page 5 of 11 <br />DocuSign Envelope ID: 9E87BB2A-48A5-4F24-81DB-E815C437B807