Browse
Search
Agenda 12-04-23; 8-h - Approval of a Professional Services Contract with BGE, Inc., for the Lake Orange Perimeter Survey
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 12-04-2023 Business Meeting
>
Agenda 12-04-23; 8-h - Approval of a Professional Services Contract with BGE, Inc., for the Lake Orange Perimeter Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 11:13:04 AM
Creation date
11/30/2023 11:14:06 AM
Metadata
Fields
Template:
BOCC
Date
12/4/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for December 4, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 12-04-2023 Business Meeting
Minutes-12-04-2023-Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2023
OTHER-2023-079-Professional Services Contract with BGE, Inc. for the Lake Orange Perimeter Survey
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-074-Refund-Release Resolution-Approval
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-075-Refund-Release Resolution-Approval
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
RES-2023-076-Exemption-Exclusion Resolution
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Orange County <br /> October 30,2023 <br /> Page 2 <br /> Task 3- Mapping and Staking of 620 contour <br /> BGE will stake one physical marker along the 620 foot (NAVD 29) elevation contour (one per property <br /> ownership) approximately midway of each property that borders Lake Orange. BGE will also stake pin <br /> flags intermittent between each rebar as to follow the contour line at approximately 50 foot intervals. BGE <br /> will also stake one wooden stake on the 615 contour adjacent to the physical marker.No pin flags will mark <br /> the 615 contour. A picture of each stake and rebar will be collected as set. <br /> • BGE will provide a signed and sealed map identifying all structures within the 620 foot and 615 <br /> foot elevation with corresponding point numbers identifying each rebar set on the project. <br /> • BGE will provide a CSV file with all coordinates of rebars set and pin flags <br /> • BGE will provide all corresponding photos of rebars set <br /> Task 3 will be delivered 105 working days from notice to proceed <br /> FEE AND EXPENSES <br /> Task 1 —Areal LIDAR/Photogrammetry mapping $36,000 <br /> Task 2—Field location of Structures Survey $36,000 <br /> Task 3—Mapping and Staking of 620 contour $36,000 <br /> Total..............................................$108,000 <br /> Serving. Leading. Solving T11 <br /> 5440 Wade Park Boulevard, Suite 102 • Raleigh, North Carolina 27607 • 919-276-0111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.