Orange County NC Website
Name: Willie Burnette <br />Address: 108 Glosson Cir. <br />City: Carrboro <br />Phone Number: 967-2130 <br />Date: July 20, 2005 <br />Hall Bath: <br />9. Install vinyl floor covering, shoemold and metal trim. <br />The vinyl to cost not less than $14/yd. <br />10. Install a new vanity. The vanity shall have a solid wood front. <br />Homeowner to choose either stained or white finish. Vanity <br />shall be complete with hardware and molded marble top. <br />11. Provide a transfer seat. <br />12. Reinstall the existing recessed medicine cabinet. <br />13. Install an access panel for the tub/shower faucet. Prime and <br />paint the access panel with semi-gloss latex paint. <br />Master Bath: <br />Remove the sheet vinyl from the floor. Prepare the floor for <br />12" x 12" composite tile. Remove all nails & clean. Install a <br />new tile floor. Homeowner to choose a stock floor from a <br />Home Improvement Center. Caulk the area between the <br />new composite floor and the wall tile. Use a 100% silicone <br />caulk. <br />Bedroom Hall: <br />Install a disappearing stairway with aluminum stairs. <br />Install new casing. Prime and paint the door and trim with <br />semi-gloss latex paint. The paint shall cover completely. <br />Trim the stairway to properly fit the floor. <br />Electric: <br />Install a 200-amp breaker panel, weather head and mast. <br />2. Install GFI outlets in the kitchen and baths. <br />1 Install electric smoke detectors in the hall and bedrooms. <br />8 <br />4. Install arc fault interrupter breakers on the bedroom circuits.