Browse
Search
Agenda - 09-07-2005-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-07-2005
>
Agenda - 09-07-2005-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:59:14 PM
Creation date
8/29/2008 10:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2005
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20050907
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Willie Burnette <br />Address: 108 Glosson Cir. <br />City: Carrboro <br />Phone Number: 967-2130 <br />Date: July 20, 2005 <br />Hall Bath: <br />9. Install vinyl floor covering, shoemold and metal trim. <br />The vinyl to cost not less than $14/yd. <br />10. Install a new vanity. The vanity shall have a solid wood front. <br />Homeowner to choose either stained or white finish. Vanity <br />shall be complete with hardware and molded marble top. <br />11. Provide a transfer seat. <br />12. Reinstall the existing recessed medicine cabinet. <br />13. Install an access panel for the tub/shower faucet. Prime and <br />paint the access panel with semi-gloss latex paint. <br />Master Bath: <br />Remove the sheet vinyl from the floor. Prepare the floor for <br />12" x 12" composite tile. Remove all nails & clean. Install a <br />new tile floor. Homeowner to choose a stock floor from a <br />Home Improvement Center. Caulk the area between the <br />new composite floor and the wall tile. Use a 100% silicone <br />caulk. <br />Bedroom Hall: <br />Install a disappearing stairway with aluminum stairs. <br />Install new casing. Prime and paint the door and trim with <br />semi-gloss latex paint. The paint shall cover completely. <br />Trim the stairway to properly fit the floor. <br />Electric: <br />Install a 200-amp breaker panel, weather head and mast. <br />2. Install GFI outlets in the kitchen and baths. <br />1 Install electric smoke detectors in the hall and bedrooms. <br />8 <br />4. Install arc fault interrupter breakers on the bedroom circuits.
The URL can be used to link to this page
Your browser does not support the video tag.