Browse
Search
Agenda - 09-07-2005-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-07-2005
>
Agenda - 09-07-2005-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:59:14 PM
Creation date
8/29/2008 10:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2005
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20050907
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Willie Burnette <br />Address: 108 Glosson Cir. <br />City: Carrboro <br />Phone Number: 967-2130 <br />Date: July 20, 2005 <br />Kitchen: <br />Repair one damaged cabinet drawer. Install the existing drawer <br />front. Install a new solid wood drawer. Install the existing <br />hardware. <br />Patch the wall in the rear right corner with sheetrock. Finish <br />the sheetrock smooth and paint to match existing wall color. <br />Hall Bath: <br />Remove the wall and ceiling covering to the framing. This <br />includes the sheetrock and tile. Remove the vanity, tub <br />and commode. <br />2. Remove the vinyl floor covering. Repair approximately <br />two sheets of damaged sheathing. Install matching <br />sheathing. <br />1 Repair two damaged floor joists below the tub. Install <br />matching treated lumber. <br />4. Install wall framing for two grab bars in the shower area. <br />The bars are to be anchored into solid blocking. The Rehab. <br />Specialist must inspect the blocking before the sheetrock is <br />Installed. Install two, 36-inch grab bars. Install one grab bar <br />on a 45 degree angle on the left hand end of the long wall in <br />the tub. Install the second grab bar horizontally to the <br />left of the enclosure at the head of the tub. <br />Install new matching door casing and baseboard. Install a <br />strike plate for the door. <br />6. Install ''/Z inch MR sheetrock on the walls and ceiling. Finish <br />the sheetrock smooth. Prime the sheetrock with a new <br />construction primer. Paint the walls, ceiling and trim with <br />semi-gloss latex paint. The paint shall cover completely. <br />7. Install a shower surround with corner shelves. The bottom <br />edge of the surround shall be water tight. <br />8, Install "/4 inch lauan plywood. Prepare the floor for <br />vinyl.
The URL can be used to link to this page
Your browser does not support the video tag.