Browse
Search
Agenda - 09-07-2005-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-07-2005
>
Agenda - 09-07-2005-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:59:14 PM
Creation date
8/29/2008 10:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2005
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20050907
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Naomi Watson <br />Address: 309 Mitchell Ln. <br />City: Chapel Hill <br />Phone Number: 929-7352 <br />Date: July 13, 2005 <br />Plumbing: <br />Install single lever, washerless faucets on the kitchen sink, <br />tub/shower and vanity. The faucet shall have a brass under- <br />body. All faucets shall be a Delta or pre-approved equal. <br />2. Re-install the existing stainless steel sink. Install new <br />aluminum strainers, p-trap assembly, supply lines and <br />cut-offs. <br />Install a handicap commode, supply line and cutoff. <br />4 <br />Install a new one piece seamless steel tub. The tub to have <br />a slip resistant bottom and porcelain enamel finish. Install new <br />trip level and drain line assembly. _ <br />5. Install a handheld shower with two clips. <br />6. Install a 24 inch factory finish, hard wood front vanity and <br />molded top. Install p-trap assembly, supply line and <br />cutoffs. <br />7. Install a main water cutoff within 5 feet from the crawlspace <br />access door. <br />8. Install new supply lines from the foundation wall to all <br />fixtures. All plumbing shall meet the current Plumbing <br />Codes. ( Remove all existing supply lines) <br />9. Install new PVC drain lines from within 4ft of the exterior <br />foundation wall to all plumbing fixtures. Install a 4 inch clean- <br />out for the main sewer line. All plumbing shall meet the <br />current Plumbing Codes. ( Remove all existing drain lines) <br />10, Contract a professional drain cleaning company to clean the <br />main sewer line from the new cleanout beside the unit to the <br />main 8 inch line at the road. <br />Mechanical: <br />28 <br />Provide a service equipment inspection by a licensed Mechanical <br />Contractor. Contractor to check: Refrigerant, compressor, fan <br />motor, air flow, furnace, etc. _
The URL can be used to link to this page
Your browser does not support the video tag.