Browse
Search
Agenda - 09-07-2005-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-07-2005
>
Agenda - 09-07-2005-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:59:14 PM
Creation date
8/29/2008 10:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2005
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20050907
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Naomi Watson <br />Address: 309 Mitchell Ln. <br />City: Chapel Hill <br />Phone Number: 929-7352 <br />Date: July 13, 2005 <br />Kitchen: <br />7. Install 14 I.f, of custom square back formica tops on all base <br />cabinets. Homeowner shall choose the color, <br />8. Install a dropped soffit for all wall cabinets. Install 1/2 " sheet- <br />rock and finish smooth. <br />9, Remove the existing exhaust fan from the kitchen ceiling. <br />Disconnect this circuit from the panel box. Patch the hole with <br />matching sheetrock. Spray to match the existing ceiling. <br />Bath: <br />Remove the wall and ceiling covering to the studs and <br />ceiling joists. <br />Replace one ceiling joist. <br />3, Install R-13 insulation in the exterior bathroom wall. <br />4, Install Y2" MR sheetrock on walls and ceiling. Tape and <br />finish the sheetrock smooth. Caulk all seams between <br />the floor and the sheetrock, <br />5. Install an ABS plastic tub enclosure with corner shelves. <br />6. Install colonial style baseboard set in a bead of caulk. <br />7. Install 2, 36-inch grab bars. Install one grab bar on a 45 <br />degree angle on the left hand end of the long wall in <br />the tub. Install the second grab bar horizontally to the <br />left of the enclosure at the head of the tub. The bars <br />are to be anchored into blocking. The Rehab Specialist <br />must inspect the blocking before the sheetrock is hung, <br />Install '/4 inch luaun plywood. Prepare the plywood for vinyl. <br />25 <br />Install vinyl floor covering, metal trim and shoemold, Vinyl <br />floor covering to cost not less than $14/yd. Set the shoe- <br />mold in a bead of caulk.
The URL can be used to link to this page
Your browser does not support the video tag.