Browse
Search
Agenda - 09-07-2005-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-07-2005
>
Agenda - 09-07-2005-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:59:14 PM
Creation date
8/29/2008 10:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2005
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20050907
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
22 <br />Name: Naomi Watson <br />Address: 309 Mitchell Ln. <br />City: Chapel Hill <br />Phone Number: 929-7352 <br />Date: July 13, 2005 <br />Exterior: <br />Pressure wash and paint the foundation of the house with <br />two coats of semi-gloss masonry exterior latex paint. <br />2. Remove the gutter and fascia. Install approx. 110 l.f, <br />of 1 x6, #2 pine fascia. Prime the new fascia with an oil <br />primer. <br />3. Repair approximately 6 ft of 5/4" corner trim. Prime all new <br />trim with an oil based primer. Cover corner trim with <br />aluminum coil stock. <br />4. Pressure wash and clean the asbestos siding for paint, Caulk <br />all seams. Paint the siding with flat exterior latex paint, the trim, <br />three crawlspace access doors, front and rear porch <br />columns, railings with semi gloss latex exterior paint. <br />Paint to cover completely. Prime all bare wood with an oil <br />primer. _ <br />5. Install vinyl siding and trim on the wood siding. Install <br />aluminum coil stock on the fascia, windows and door trim. <br />Install vented soffit on all overhangs. <br />Re-install all awnings. <br />6. Install aluminum, continuous gutters, downspouts and leaf <br />guards. Install solid drain-tile to all downspouts to divert water <br />away from the foundation. Install the drain-tile below grade <br />where possible. Install at least 10 ft section of drain-tile to <br />each downspout. <br />Crawlspace: <br />Install three crawlspace access doors of % inch plywood on <br />pressure treated frames with 2x4 cross bracing. Install <br />galvanized hinges and locking hasps. <br />Roof: <br />Remove the roof covering to the sheathing. Install 15 lb. <br />felt, white aluminum drip edge, new plumbing boots and <br />twenty five year shingles.
The URL can be used to link to this page
Your browser does not support the video tag.