Browse
Search
Agenda - 09-07-2005-5p
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2005
>
Agenda - 09-07-2005
>
Agenda - 09-07-2005-5p
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 2:59:14 PM
Creation date
8/29/2008 10:39:29 AM
Metadata
Fields
Template:
BOCC
Date
9/7/2005
Document Type
Agenda
Agenda Item
5p
Document Relationships
Minutes - 20050907
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Willie Mae Patterson <br />Address: 400 McDade St. <br />City: Chapel Hill, N.C. 27516 <br />Phone: 942-6030 <br />Date: June 15, 2005 <br />Windows: <br />Install five (5) vinyl replacement windows on the left side addition. <br />The windows shall be complete with sash lock, screen and trim. <br />Finish all new trim to match the existing room finish. <br />Kitchen: <br />Prepare the kitchen/dining room for vinyl. Install %4" lauan plywood <br />and a new vinyl floor. The vinyl to cost not less than $ 14 sq.yd. <br />Install metal trim at all door openings. Install new painted shoe <br />molding at all cabinet and wall areas, _ <br />Prepare the white paneling for paint. Paint the paneling with semi- <br />gloss latex paint. The paint shall cover completely. <br />Bathroom: <br />1. Secure the loose tiles in the tub/shower area. Re-caulk the tub/ <br />shower with an approved tub caulk <br />2. Install 2 %z" wood screws in the top hinge of the bathroom door. <br />Tighten the hinge so the door will close properly. <br />Electric: <br />I . Install a new 200 amp breaker panel, meter base, mast and weather- <br />head. Make all electrical connections. Install underground service. <br />2. Remove a 2ft x 14ft section of concrete from the driveway for the <br />underground service line. The Rehab. Specialist to verify the exact <br />location. Use a masonry saw to cut the concrete. Patch the driveway <br />with concrete when electric work is complete. <br />3. Install hard wired smoke detectors in all sleeping rooms and one <br />in the hallway. <br />4. Install arc fault interrupter circuits on the bedroom circuits. <br />5. Install a service receptacle at the furnace. <br />17 <br />6. Install three (:3) GFI protected receptacles in the kitchen. <br />Install one GFI protected receptacle in the batluoom,
The URL can be used to link to this page
Your browser does not support the video tag.