Orange County NC Website
Name: Willie Burnette <br />Address: 108 Glosson Cir. <br />City: Carrboro <br />Phone Number: 967-2130 <br />Date: July 20, 2005 <br />Exterior Grade Work: <br />Raise the grade along the front and right side foundation walls. <br />Install a large vent well on the front right foundation vent. <br />Install a tandem load ( 12 yds) of soil. Raise the grade to divert <br />water away from the foundation wall. All excess soil may be <br />placed along low areas along the rear and left side wall, <br />Install solid drain-tile on the front right downspout, Install <br />the drain-tile before the soil is placed beside the foundation. <br />The drain-tile shall extend 10 ft past the rear foundation wall. <br />Seed and straw all exposed areas. _ <br />Install drain tile on the left front and right side foundation <br />walls. Dig to the footing, The ditch shall extend at least 24" <br />out from the foundation wall. Clean footing and wall and <br />prepare for water-proofing, Waterproof the top of footing <br />and wall to with 2 inches below the new grade. Install crushed <br />gravel and landscape fabric, Place a minimum of 12" of gravel <br />on the side and top of drain tile. All drain the shall extend <br />10 ft, past the rear of the unit. <br />Crawlspace: <br />Repair the termite damage along the front and right side <br />foundation wall. Replace approximately 60 linear ft of damaged <br />sill and band. Install a temporary dropped girder to support <br />the floor system while replacing the damaged framing. <br />Install a temporary 4x6 in the interior ceiling corner to <br />support the roof load while the band and sill is being <br />replaced. ( See Plan) <br />Note: All new lumber installed shall be pressured lumber. <br />Cut the existing floor joist approximately 2 ft from the foundation <br />wall. Remove the 2ft section of floor joist to expose the band and <br />sill. Double the existing floor joists along the entire length of the <br />front. Install pressure treated 2x8 floor joists. <br />Nail the two joists together with 16 penny galvanized nails. <br />The joists must rest on the foundation plate and center girder. <br />Install a new piece of 2x8 to fill in the 2ft missing section. <br />A permit is required for this work. _