Browse
Search
Agenda 12-04-23; 8-h - Approval of a Professional Services Contract with BGE, Inc., for the Lake Orange Perimeter Survey
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2023
>
Agenda - 12-04-2023 Business Meeting
>
Agenda 12-04-23; 8-h - Approval of a Professional Services Contract with BGE, Inc., for the Lake Orange Perimeter Survey
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2023 11:13:04 AM
Creation date
11/30/2023 11:03:50 AM
Metadata
Fields
Template:
BOCC
Date
12/4/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-h
Document Relationships
Agenda for December 4, 2023 BOCC Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2023\Agenda - 12-04-2023 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> up water supply (via the Eno River) for the Town, OAWS, Orange Water and Sewer Authority <br /> (OWASA) and the City of Mebane by virtue of emergency water interconnections. <br /> The Project is part of Orange County's current (FY 2023-33) Capital Investment Plan (CIP) (see <br /> Attachment 2 for FY 2023-33 CIP Summary). The Project scope is specific to a topographic <br /> survey of the full perimeter of Lake Orange (approximately six miles) inclusive of: aerial <br /> photography and mapping, geospatial location of the 615-ft and 620-ft elevation contours <br /> surrounding Lake Orange, and geospatial location of over 100 private docks/ramps/bulkheads <br /> and/or other private structures located around the shorelines of Lake Orange. Private lot surveys <br /> and/or private lot title surveys are not included in the Project scope. <br /> All work for the Project will be conducted on property owned by Orange County and/or Lake <br /> Orange, Inc., or, conducted within the recorded flood easements located adjacent to the shoreline <br /> of Lake Orange. The topographic survey work will be geospatially tied into known vertical and <br /> horizontal datums. Prior to the commencement of work, Orange County staff will schedule and <br /> conduct a Neighborhood Information Meeting with affected Lake Orange residents and/or affected <br /> property owners to explain the Project and field any questions/inquiries/concerns from the public. <br /> Attachment 3 details the Scope of Services. <br /> On April 27, 2023, Orange County published a Request for Qualifications (RFQ) No. 367-005385 <br /> for the Project. On May 16, 2023, Orange County received eight (8) Statements of Qualifications <br /> from qualified Professional Surveying consultants. The evaluation panel for the Project then <br /> selected the four (4) highest scoring consultants for interviews based on the project-specific <br /> scoring criteria as contained within the RFQ. Interviews were conducted by the evaluation panel <br /> on July 25, 2023, and July 26, 2023. Subsequently, the Evaluation Panel selected BGE, Inc. as <br /> the highest-qualified consultant for the Project, based on scoring and interview performance. <br /> Attachment 4 is the Letter of Recommendation for the Project. <br /> Orange County's standard professional services contract was modified to address vendor <br /> concerns regarding its standard of care and professionalism, in order that it can be assured of <br /> insurance coverage for the scoped work. BGE, Inc. shall perform its services consistent with the <br /> professional skill and care ordinarily provided by similar professionals practicing in the same or <br /> similar locality under the same or similar circumstances. BGE, Inc. shall perform its services as <br /> expeditiously as is consistent with such professional skill and care and the orderly progress of the <br /> project. <br /> The anticipated Project schedule is as follows: <br /> Task Duration/Completion Timeline <br /> Aerial LIDAR/Photogrammetry Mapping 45 working days after Notice to Proceed (NTP) <br /> Field Location of Structures Survey 75 working days after Notice to Proceed (NTP) <br /> Mapping and Staking of 620-ft Contour 105 working days after Notice to Proceed (NTP) <br /> FINANCIAL IMPACT: Through prior years' CIP budgeting and current year CIP budgeting, the <br /> Board has appropriated $108,000 for the Project. The pending negotiated professional services <br /> agreement will not exceed the appropriated budget for the Project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.