Orange County NC Website
Scope of Work <br />Siemens has visited site on 5 occasions to interconnect new panel at Passmore with existing panel at <br />Sportsplex. Other company in charge of the Sportsplex panel hasn't been present or it hasn't been ready for <br />us to finish our job. We have also finished work for additional increase of scope to release doors or the Day <br />Care Center, reprogramming and engineering. <br />Exclusions and Clarifications <br />Work to be performed on regular time. <br />Inclusions <br />1.Engineering <br />2.Project Management for Siemens Scope of work <br />3.System Commissioning and Final Pretest <br />4.Final AHJ Testing and certification <br />5.Fire Alarm Submittal to customer <br />6.Fire Alarm Submittal to AHJ <br />7.Supply or installation of any electrical conduits, cables, wiring or back boxes, and equipment <br />8.As interpreted in the specifications, as shown on drawings, and as defined in this proposal <br />9.One (1) year warranty <br />10.Final wiring terminations to the control panel <br />11.Programming <br />Page 5 of 10 <br />DocuSign Envelope ID: FF68AEDC-6252-4FCC-B7E7-EB41C9214613