Browse
Search
2023-663-E-Planning Dept-Timmons Group-Construction Phase Service CPS or the Gravelly Hill Middle School Stormwater Wetland Retrofit Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-663-E-Planning Dept-Timmons Group-Construction Phase Service CPS or the Gravelly Hill Middle School Stormwater Wetland Retrofit Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:46:02 PM
Creation date
11/21/2023 2:45:54 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$20,980.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br /> <br />EXHIBIT A <br />SCOPE OF SERVICES <br />5410 Trinity Rd. <br />Suite 102 <br />Raleigh, NC 27607 <br />P 919.866.4951 <br />F 919.859.5663 <br />www.timmons.com <br />The existing legacy stormwater basin located at Gravelly Hill Middle School is proposed to be converted <br />to a stormwater wetland following 15A NCAC 02H .1054 - Minimum Design Criteria for Stormwater <br />Wetlands and guidance provided in the NCDEQ Stormwater Design Manual, Part C-4. The purpose of the <br />project is to provide a design and construct a stormwater wetland that meets state and local guidelines <br />for stormwater management to provide water quality and quantity benefits to the County while taking <br />the opportunity to educate students and the public about stormwater issues and wetland benefits in the <br />process, both during and post construction. <br /> <br />The following tasks are proposed in support of the project objectives as an addition to the current scope. <br /> <br />Task 1 – Construction Review and Geotechnical Support <br /> <br />Construction Submittal/RFI review <br />The Engineer shall provide consultation during construction on a fixed fee basis. Tasks may include: <br />a) Review of contractor fee proposal <br />b) Submittal review <br />c) Shop drawing review <br />d) Respond to Request for Information (RFI) <br />e) Investigation of proposed contract change orders <br /> <br />Should funding under this task become exhausted, an additional services work order shall be negotiated <br />for additional support if needed. <br /> <br />Geotechnical Support <br />Under this Agreement, Timmons Group will provide construction materials testing and special inspection <br />services with potential services, exclusions, and assumptions. It is anticipated that the fee would cover up <br />to approximately two weeks of field testing time plus one week of half days. Tasks may include the following <br />as requested: <br />Subgrade Evaluation <br />Our personnel can visually evaluate the contractor grading and proof rolling structural areas for the <br />spillway area to verify that the areas have been stripped and to document that objectionable soils have <br />been removed, and/or loose soils have been stabilized. Soils subgrade conditions prior to fill placement <br />or at finished grade. This evaluation will be performed through proof rolling to help identify areas which <br />pump, rut, or deflect under passage of construction equipment. Where deficiencies are noted during <br />subgrade evaluation, we can suggest and observe remedial actions, including undercutting and reworking <br />of the soil subgrades. <br />DocuSign Envelope ID: B64BB097-D2D0-4F1C-B29D-09757C8A1D1C
The URL can be used to link to this page
Your browser does not support the video tag.