Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br />33 41 00 STORM UTILITY DRAINAGE <br />PIPING <br />Page 2 of 3 <br />3.2 PIPING INSTALLATION <br />A. General Locations and Arrangements: Drawing plans and details indicate general location and <br />arrangement of underground storm drainage piping. Location and arrangement of piping layout <br />take into account design considerations. Install piping as indicated, to extent practical. Where <br />specific installation is not indicated, follow piping manufacturer's written instructions. <br />B. Install piping beginning at low point, true to grades and alignment indicated with unbroken <br />continuity of invert. Place bell ends of piping facing upstream. Install gaskets, seals, sleeves, and <br />couplings according to manufacturer's written instructions for use of lubricants, cements, and <br />other installation requirements. <br />C. Install manholes for changes in direction unless fittings are indicated. Use fittings for branch <br />connections unless direct tap into existing sewer is indicated. <br />D. Install proper size increasers, reducers, and couplings where different sizes or materials of pipes <br />and fittings are connected. Reducing size of piping in direction of flow is prohibited. <br />E. When installing pipe under streets or other obstructions that cannot be disturbed, use pipe-jacking <br />process of microtunneling. <br />F. Install gravity-flow, nonpressure drainage piping according to the following: <br />1. Install piping pitched down in direction of flow. <br />2. Install piping to invert inverts shown on Drawings. <br />3. Install piping per local, state and manufacturer recommendations. <br />3.3 STORM DRAINAGE STRUCTURES <br />A. General: Install junction boxes, catch basins and drop inlets according to local, state and <br />manufacturer recommendations. <br />B. Install precast concrete manhole sections with sealants according to ASTM C 891. <br />C. Where specific manhole construction is not indicated, follow manhole manufacturer's written <br />instructions. <br />D. Set tops of frames and covers flush with finished surface of manholes that occur in pavements. <br />Set tops 3 inches above finished surface elsewhere unless otherwise indicated. <br />E. Where drop inlets are called for along the edge of proposed pavements, the drop inlet casting shall <br />be set parallel and immediately adjacent to the edge of the pavement, so as to result in a neat <br />finished appearance. <br />F. Storm structure inverts shall be constructed as shown in the Drawings. <br />G. Riser structure shall be placed at exact elevation shown in the Drawings. <br />H. Cleanout structures shall be constructed at the exact location shown in the Drawings. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.