Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br />33 41 00 STORM UTILITY DRAINAGE <br />PIPING <br />Page 1 of 3 <br />SECTION 33 41 00 - STORM UTILITY DRAINAGE PIPING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. All utilities incorporated <br />in the project shall be provided, installed and tested in accordance with Local Municipal <br />Regulations <br />B. NCDOT Standards and Specifications for work inside public right-of-way. <br />C. Local Municipal standards and specifications for work on site. <br />1.2 DELIVERY, STORAGE, AND HANDLING <br />A. Do not store plastic manholes, pipe, and fittings in direct sunlight. <br />B. Protect pipe, pipe fittings, and seals from dirt and damage. <br />C. Handle manholes according to manufacturer's written rigging instructions. <br />D. Handle catch basins, stormwater inlets and stormwater riser structures according to <br />manufacturer's written rigging instructions. <br />1.3 PROJECT CONDITIONS <br />A. Interruption of Existing Storm Drainage Service: Do not interrupt service to facilities occupied <br />by Owner or others unless permitted under the following conditions and then only after arranging <br />to provide temporary service according to requirements indicated: <br />1. Notify Construction Manager no fewer than 7 calendar days days in advance of proposed <br />interruption of service. <br />2. Do not proceed with interruption of service without Construction Manager's written <br />permission. <br />PART 2 - PRODUCTS <br />PART 3 - EXECUTION <br />3.1 EARTHWORK <br />A. Excavation, trenching, and backfilling are specified in Section 31 20 00 "Earth Moving." <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.