Orange County NC Website
9/2/2020 <br /> <br />32 13 13 CONCRETE PAVING Page 12 of 12 <br />B. Drill test cores, where directed by Engineer, when necessary to determine magnitude of cracks or <br />defective areas. Fill drilled core holes in satisfactory paving areas with portland cement concrete <br />bonded to paving with epoxy adhesive. <br />C. Protect concrete paving from damage. Exclude traffic from paving for at least 14 days after <br />placement. When construction traffic is permitted, maintain paving as clean as possible by <br />removing surface stains and spillage of materials as they occur. <br />D. Maintain concrete paving free of stains, discoloration, dirt, and other foreign material. Sweep <br />paving not more than two days before date scheduled for Substantial Completion inspections. <br />END OF SECTION 32 13 13 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03