Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br />32 13 13 CONCRETE PAVING Page 1 of 12 <br />SECTION 32 13 13 - CONCRETE PAVING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes Concrete Paving Including the Following: <br />1. Driveways. <br />2. Curbs and gutters. <br />3. Walks. <br />4. Dumpster Pad <br />B. Related Requirements: <br />1. Section 03 30 00 "Cast-in-Place Concrete" for general building applications of concrete. <br />2. Section 32 13 73 "Concrete Paving Joint Sealants" for joint sealants in expansion and <br />contraction joints within concrete paving and in joints between concrete paving and asphalt <br />paving or adjacent construction. <br />3. Section 32 17 13 "Parking Bumpers." <br />4. Section 32 17 23 "Pavement Markings." <br />1.3 DEFINITIONS <br />A. Cementitious Materials: Portland cement alone or in combination with one or more of blended <br />hydraulic cement, fly ash, slag cement, and other pozzolans. <br />B. W/C Ratio: The ratio by weight of water to cementitious materials. <br />1.4 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1. Review methods and procedures related to concrete paving, including but not limited to, <br />the following: <br />a. Concrete mixture design. <br />b. Quality control of concrete materials and concrete paving construction practices. <br />2. Require representatives of each entity directly concerned with concrete paving to attend, <br />including the following: <br />a. Contractor's superintendent. <br />b. Independent testing agency responsible for concrete design mixtures. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.