Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br />31 20 00 EARTH MOVING Page 9 of 13 <br />1. Stockpile soil materials away from edge of excavations. Do not store within drip line of <br />remaining trees. <br />2. No material may be stockpiled on adjacent properties, except as approved by the engineer <br />and adjacent property owner. <br />3. Any material that is determined to be excess material shall be removed from the site in a <br />timely manner. <br />4. Stockpiling of materials will be done in a manner as not to effect the progress of the project. <br />3.11 BACKFILL <br />A. Place and compact backfill in excavations promptly, but not before completing the following: <br />1. Construction below finish grade including, where applicable, subdrainage, dampproofing, <br />waterproofing, and perimeter insulation. <br />2. Surveying locations of underground utilities for Record Documents. <br />3. Testing and inspecting underground utilities. <br />4. Removing concrete formwork. <br />5. Removing trash and debris. <br />6. Removing temporary shoring, bracing, and sheeting. <br />7. Installing permanent or temporary horizontal bracing on horizontally supported walls. <br />B. Place backfill on subgrades free of mud, frost, snow, or ice. <br />3.12 UTILITY TRENCH BACKFILL <br />A. Place backfill on subgrades free of mud, frost, snow, or ice. <br />B. Place and compact bedding course on trench bottoms and where indicated. Shape bedding course <br />to provide continuous support for bells, joints, and barrels of pipes and for joints, fittings, and <br />bodies of conduits. See Plan Details <br />C. Backfill voids with satisfactory soil while removing shoring and bracing. <br />D. Initial Backfill: <br />1. Soil Backfill: Place and compact initial backfill of satisfactory soil, free of particles larger <br />than 1 inch in any dimension, to a height of 12 inchesover the pipe or conduit. <br />a. Carefully compact initial backfill under pipe haunches and compact evenly up on <br />both sides and along the full length of piping or conduit to avoid damage or <br />displacement of piping or conduit. Coordinate backfilling with utilities testing. <br />2. Controlled Low-Strength Material: Place initial backfill of controlled low-strength material <br />to a height of 12 inchesover the pipe or conduit. Coordinate backfilling with utilities <br />testing. <br />E. Final Backfill: <br />1. Soil Backfill: Place and compact final backfill of satisfactory soil to final subgrade <br />elevation. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.