Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 017700 - 5 <br />B. Shop drawings, illustrations, schedules, performance charts, brochures, and other data which are <br />prepared by the Contractor or any subcontractor, manufacturer, supplier, or distributor and which <br />illustrates some portion of the work. Submit shop drawings of all major building elements. Place <br />all required shop drawings in one complete package that illustrates the full scope of the project. <br />The intent of this requirement is to have one submittal package with all components of the project <br />detailed in a single booklet. <br />1. The submittals shall be reviewed first by the Contractor and then by the Architect. The <br />submittal package shall be marked with an approval stamp, signed and dated by both the <br />Contractor. After reviewed, submit the Record Drawing package to the Owner in electronic <br />PDF form. <br />PART 2 - PRODUCTS <br />2.1 MATERIALS <br />A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator <br />of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health <br />or property or that might damage finished surfaces. <br />PART 3 - EXECUTION <br />3.1 FINAL CLEANING <br />A. General: Perform final cleaning. Conduct cleaning and waste-removal operations to comply with <br />local laws and ordinances and Federal and local environmental and antipollution regulations. <br />B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each <br />surface or unit to condition expected in an average commercial building cleaning and maintenance <br />program. Comply with manufacturer's written instructions. <br />1. Complete the following cleaning operations before requesting inspection for certification <br />of Substantial Completion for entire Project or for a designated portion of Project: <br />a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, <br />including landscape development areas, of rubbish, waste material, litter, and other <br />foreign substances. <br />C. Pest Control: Comply with pest control requirements in Section 015000 "Temporary Facilities <br />and Controls." Prepare written report. <br />D. Construction Waste Disposal: Comply with waste disposal requirements in Section 017419 <br />"Construction Waste Management and Disposal." <br />3.2 REPAIR OF THE WORK <br />A. Complete repair and restoration operations before requesting inspection for determination of <br />Substantial Completion. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.