Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 017700 - 3 <br />4. Perform preventive maintenance on equipment used prior to Substantial Completion. <br />5. Instruct Owner's personnel in operation, adjustment, and maintenance of products, <br />equipment, and systems. Submit demonstration and training video recordings specified in <br />Section 017900 "Demonstration and Training." <br />6. Advise Owner of changeover in heat and other utilities. <br />7. Participate with Owner in conducting inspection and walkthrough with local emergency <br />responders. <br />8. Terminate and remove temporary facilities from Project site, along with mockups, <br />construction tools, and similar elements. <br />9. Complete final cleaning requirements, including touchup painting. <br />10. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual <br />defects. <br />D. Inspection: Submit a written request for inspection to determine Substantial Completion a <br />minimum of 10 days prior to date the work will be completed and ready for final inspection and <br />tests. On receipt of request, Architect will either proceed with inspection or notify Contractor of <br />unfulfilled requirements. Architect will prepare the Certificate of Substantial Completion after <br />inspection or will notify Contractor of items, either on Contractor's list or additional items <br />identified by Architect, that must be completed or corrected before certificate will be issued. <br />1. Reinspection: Request reinspection when the Work identified in previous inspections as <br />incomplete is completed or corrected. <br />2. Results of completed inspection will form the basis of requirements for final completion. <br />1.7 FINAL COMPLETION PROCEDURES <br />A. Submittals Prior to Final Completion: Before requesting final inspection for determining final <br />completion, complete the following: <br />1. Submit a final Application for Payment according to Section 012900 "Payment <br />Procedures." <br />2. Certified List of Incomplete Items: Submit certified copy of Architect's Substantial <br />Completion inspection list of items to be completed or corrected (punch list), endorsed and <br />dated by Architect. Certified copy of the list shall state that each item has been completed <br />or otherwise resolved for acceptance. <br />3. Certificate of Insurance: Submit evidence of final, continuing insurance coverage <br />complying with insurance requirements. <br />4. Submit pest-control final inspection report. <br />5. Instruct Owner's personnel in operation, adjustment, and maintenance products, equipment <br />and systems. <br />B. Inspection: Submit a written request for final inspection to determine acceptance a minimum of <br />10 days prior to date the work will be completed and ready for final inspection and tests. On <br />receipt of request, Architect will either proceed with inspection or notify Contractor of unfulfilled <br />requirements. Architect will prepare a final Certificate for Payment after inspection or will notify <br />Contractor of construction that must be completed or corrected before certificate will be issued. <br />1. Reinspection: Request reinspection when the Work identified in previous inspections as <br />incomplete is completed or corrected. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03