9/2/2020 <br /> <br /> 017700 - 2 <br />1.5 MAINTENANCE MATERIAL SUBMITTALS <br />A. Schedule of Maintenance Material Items: For maintenance material submittal items specified in <br />other Sections. <br />1.6 SUBSTANTIAL COMPLETION PROCEDURES <br />A. Contractor's List of Incomplete Items: Prepare and submit a list of items to be completed and <br />corrected (Contractor's punch list), indicating the value of each item on the list and reasons why <br />the Work is incomplete. <br />B. Submittals Prior to Substantial Completion: Complete the following a minimum of 10 days prior <br />to requesting inspection for determining date of Substantial Completion. List items below that are <br />incomplete at time of request. <br />1. Certificates of Release: Obtain and submit releases from authorities having jurisdiction <br />permitting Owner unrestricted use of the Work and access to services and utilities. Include <br />occupancy permits, operating certificates, and similar releases. <br />2. Submit closeout submittals specified in other Division 01 Sections, including project <br />record documents, operation and maintenance manuals, final completion construction <br />photographic documentation, damage or settlement surveys, property surveys, and similar <br />final record information. <br />3. Submit closeout submittals specified in individual Sections, including specific warranties, <br />workmanship bonds, maintenance service agreements, final certifications, and similar <br />documents. <br />4. Submit maintenance material submittals specified in individual Sections, including tools, <br />spare parts, extra materials, and similar items, and deliver to location designated by <br />Architect. Label with manufacturer's name and model number where applicable. <br />a. Schedule of Maintenance Material Items: Prepare and submit schedule of <br />maintenance material submittal items, including name and quantity of each item and <br />name and number of related Specification Section. Obtain Architect's signature for <br />receipt of submittals. <br />5. Submit test/adjust/balance records. <br />6. Submit changeover information related to Owner's occupancy, use, operation, and <br />maintenance. Make final changeover of permanent locks and deliver keys to Owner. <br />Advise Owner's personnel of changeover in security provisions. <br />7. Camera inspection of sanitary sewer system and the "jetting-out" of the sewer line after the <br />final cleaning is completed. A copy of the video shall be saved in acceptable format on a <br />disc or thumb drive. <br />8. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual <br />defects. <br />C. Procedures Prior to Substantial Completion: Complete the following a minimum of 10 days prior <br />to requesting inspection for determining date of Substantial Completion. List items below that are <br />incomplete at time of request. <br />1. Advise Owner of pending insurance changeover requirements. <br />2. Make final changeover of permanent locks and deliver keys to Owner. Advise Owner's <br />personnel of changeover in security provisions. <br />3. Complete startup and testing of systems and equipment. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03