Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 017419 - 2 <br />3) Boxes. <br />4) Plastic sheet and film. <br />5) Polystyrene packaging. <br />6) Wood crates. <br />7) Plastic pails. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 PLAN IMPLEMENTATION <br />A. General: Implement approved waste management plan. Provide handling, containers, storage, <br />signage, transportation, and other items as required to implement waste management plan during <br />the entire duration of the Contract. <br />1. Comply with operation, termination, and removal requirements in Section 015000 <br />"Temporary Facilities and Controls." <br />B. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum <br />interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities. <br />1. Designate and label specific areas on Project site necessary for separating materials that <br />are to be salvaged, recycled, reused, donated, and sold. <br />2. Comply with Section 015000 "Temporary Facilities and Controls" for controlling dust and <br />dirt, environmental protection, and noise control. <br />3.2 DISPOSAL OF WASTE <br />A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove <br />waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable <br />to authorities having jurisdiction. <br />1. Except as otherwise specified, do not allow waste materials that are to be disposed of <br />accumulate on-site. <br />2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces <br />and areas. <br />B. Burning: Do not burn waste materials. <br />C. Disposal: Remove waste materials from Owner's property and legally dispose of them. <br />D. The contractor shall be responsible for procurement of all permits or rights as governed by local <br />ordinances for disposal of materials at said landfill or disposal sites. <br />E. The contractor shall take appropriate measures, while hauling waste materials to landfill or <br />disposal site, to prevent demolition debris from spilling and thus affecting the safe use of public <br />and private roads. Debris control during course of disposal and removal from project site on <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.