Orange County NC Website
9/2/2020 <br /> <br /> 017300 - 7 <br />2. Do not hold waste materials more than seven days during normal weather or three days if <br />the temperature is expected to rise above 80 deg F (27 deg C). <br />3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark <br />containers appropriately and dispose of legally, according to regulations. <br />a. Use containers intended for holding waste materials of type to be stored. <br />4. Coordinate progress cleaning for joint-use areas where Contractor and other contractors <br />are working concurrently. <br />B. Site: Maintain Project site free of waste materials and debris. <br />C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper <br />execution of the Work. <br />1. Remove liquid spills promptly. <br /> <br />D. Installed Work: Keep installed work clean. Clean installed surfaces according to written <br />instructions of manufacturer or fabricator of product installed, using only cleaning materials <br />specifically recommended. If specific cleaning materials are not recommended, use cleaning <br />materials that are not hazardous to health or property and that will not damage exposed surfaces. <br />E. Exposed Surfaces in Finished Areas: Clean exposed surfaces and protect as necessary to ensure <br />freedom from damage and deterioration at time of Substantial Completion. <br />F. Waste Disposal: Do not bury or burn waste materials on-site. Do not wash waste materials down <br />sewers or into waterways. Comply with waste disposal requirements in Section 017419 <br />"Construction Waste Management and Disposal." <br />G. During handling and installation, clean and protect construction in progress and adjoining <br />materials already in place. Apply protective covering where required to ensure protection from <br />damage or deterioration at Substantial Completion. <br />H. Clean and provide maintenance on completed construction as frequently as necessary through the <br />remainder of the construction period. Adjust and lubricate operable components to ensure <br />operability without damaging effects. <br />I. Limiting Exposures: Supervise construction operations to assure that no part of the construction, <br />completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious <br />exposure during the construction period. <br />3.8 PROTECTION OF INSTALLED CONSTRUCTION <br />A. Provide final protection and maintain conditions that ensure installed Work is without damage or <br />deterioration at time of Substantial Completion. <br />B. Comply with manufacturer's written instructions for temperature and relative humidity. <br />END OF SECTION 017300 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03