Orange County NC Website
9/2/2020 <br /> <br /> 017300 - 3 <br />B. Existing Conditions: The existence and location of underground and other utilities and <br />construction indicated as existing are not guaranteed. Before beginning sitework, investigate and <br />verify the existence and location of underground utilities, and other construction affecting the <br />Work. <br />1. Before construction, verify the location and invert elevation at points of connection of <br />sanitary sewer, storm sewer, and water-service piping; underground electrical services, and <br />other utilities. <br />2. Furnish location data for work related to Project that must be performed by public utilities <br />serving Project site. <br />C. Examination and Acceptance of Conditions: Before proceeding with each component of the <br />Work, examine substrates, areas, and conditions, with Installer or Applicator present where <br />indicated, for compliance with requirements for installation tolerances and other conditions <br />affecting performance. Record observations. <br />1. Examine walls, floors, and roofs for suitable conditions where products and systems are to <br />be installed. <br />D. Written Report: Where a written report listing conditions detrimental to performance of the Work <br />is required by other Sections, include the following: <br />1. Description of the Work. <br />2. List of detrimental conditions, including substrates. <br />3. List of unacceptable installation tolerances. <br />4. Recommended corrections. <br />E. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding <br />with the Work indicates acceptance of surfaces and conditions. <br />3.2 PREPARATION <br />A. Existing Utility Information: Furnish information to local utility that is necessary to adjust, move, <br />or relocate existing utility structures, utility poles, lines, services, or other utility appurtenances <br />located in or affected by construction. Coordinate with authorities having jurisdiction. <br />B. Field Measurements: Take field measurements as required to fit the Work properly. Recheck <br />measurements before installing each product. Where portions of the Work are indicated to fit to <br />other construction, verify dimensions of other construction by field measurements before <br />fabrication. Coordinate fabrication schedule with construction progress to avoid delaying the <br />Work. <br />C. Space Requirements: Verify space requirements and dimensions of items shown <br />diagrammatically on Drawings. <br />D. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for <br />clarification of the Contract Documents caused by differing field conditions outside the control <br />of Contractor, submit a request for information to Architect according to requirements in Section <br />013100 "Project Management and Coordination." <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03