Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 015000 - 7 <br />3.5 OPERATION, TERMINATION, AND REMOVAL <br />A. Supervision: Enforce strict discipline in use of temporary facilities. To minimize waste and abuse, <br />limit availability of temporary facilities to essential and intended uses. <br />B. Maintenance: Maintain facilities in good operating condition until removal. <br />1. Maintain operation of temporary enclosures, heating, cooling, humidity control, <br />ventilation, and similar facilities on a 24-hour basis where required to achieve indicated <br />results and to avoid possibility of damage. <br />C. Temporary Facility Changeover: Do not change over from using temporary security and <br />protection facilities to permanent facilities until Substantial Completion. <br />D. Termination and Removal: Remove each temporary facility when need for its service has ended, <br />when it has been replaced by authorized use of a permanent facility, or no later than Substantial <br />Completion. Complete or, if necessary, restore permanent construction that may have been <br />delayed because of interference with temporary facility. Repair damaged Work, clean exposed <br />surfaces, and replace construction that cannot be satisfactorily repaired. <br />1. Materials and facilities that constitute temporary facilities are property of Contractor. <br />Owner reserves right to take possession of Project identification signs. <br />2. At Substantial Completion, repair, renovate, and clean permanent facilities used during <br />construction period. Comply with final cleaning requirements specified in Section 017700 <br />"Closeout Procedures." <br />END OF SECTION 015000 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.