Orange County NC Website
9/2/2020 <br /> <br /> 015000 - 2 <br />1.5 QUALITY ASSURANCE <br />A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for temporary <br />electric service. Install service to comply with NFPA 70. <br />B. Tests and Inspections: Arrange for authorities having jurisdiction to test and inspect each <br />temporary utility before use. Obtain required certifications and permits. <br />1.6 PROJECT CONDITIONS <br />A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service to assume <br />responsibility for operation, maintenance, and protection of each permanent service during its use <br />as a construction facility before Owner's acceptance, regardless of previously assigned <br />responsibilities. <br />PART 2 - PRODUCTS <br />2.1 TEMPORARY FACILITIES – NOT REQUIRED <br />A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, temperature <br />controls, and foundations adequate for normal loading. <br />B. Common-Use Field Office: Of sufficient size to accommodate needs of Owner, Architect, and <br />construction personnel office activities and to accommodate Project meetings specified in other <br />Division 01 Sections. Keep office clean and orderly. Furnish and equip offices as follows: <br />1. Furniture required for Project-site documents including file cabinets, plan tables, plan <br />racks, and bookcases. <br />2. Conference room of sufficient size to accommodate meetings of 10 individuals. Provide <br />electrical power service and 120-V ac duplex receptacles, with no fewer than one <br />receptacle on each wall. - <br />3. Drinking water and private toilet. <br />4. Heating and cooling equipment necessary to maintain a uniform indoor temperature of 68 <br />to 72 deg F. <br />5. Lighting fixtures capable of maintaining average illumination of 20 fc at desk height. <br />C. Storage and Fabrication Sheds: Provide sheds sized, furnished, and equipped to accommodate <br />materials and equipment for construction operations. <br />1. Store combustible materials apart from building. <br />2.2 EQUIPMENT <br />A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as required by locations <br />and classes of fire exposures. <br />B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, provide vented, <br />self-contained, liquid-propane-gas or fuel-oil heaters with individual space thermostatic control. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03