Orange County NC Website
9/2/2020 <br /> <br /> 014000 - 8 <br />possible. Comply with the Contract Document requirements for cutting and patching in <br />Section 017300 "Execution." <br />B. Protect construction exposed by or for quality-control service activities. <br />C. Repair and protection are Contractor's responsibility, regardless of the assignment of <br />responsibility for quality-control services. <br />END OF SECTION 014000 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03