Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 014000 - 7 <br />7. Security and protection for samples and for testing and inspecting equipment at Project <br />site. <br />H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and <br />-control services with a minimum of delay and to avoid necessity of removing and replacing <br />construction to accommodate testing and inspecting. <br />1. Schedule times for tests, inspections, obtaining samples, and similar activities. <br />1.9 SPECIAL TESTS AND INSPECTIONS <br />A. Special Tests and Inspections: Conducted by a qualified special inspector as required by <br />authorities having jurisdiction, as indicated in individual Specification Sections and in Statement <br />of Special Inspections attached to this Section, and as follows: <br />1. Verifying that manufacturer maintains detailed fabrication and quality-control procedures <br />and reviews the completeness and adequacy of those procedures to perform the Work. <br />2. Submitting a final report of special tests and inspections at Substantial Completion, which <br />includes a list of unresolved deficiencies. <br />3. Retesting and reinspecting corrected work. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 TEST AND INSPECTION LOG <br />A. Test and Inspection Log: Prepare a record of tests and inspections. Include the following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or inspection. <br />B. Maintain log at Project site. Post changes and revisions as they occur. Provide access to test and <br />inspection log for Architect's, Commissioning Authority's, reference during normal working <br />hours. <br />3.2 REPAIR AND PROTECTION <br />A. General: On completion of testing, inspecting, sample taking, and similar services, repair <br />damaged construction and restore substrates and finishes. <br />1. Provide materials and comply with installation requirements specified in other <br />Specification Sections or matching existing substrates and finishes. Restore patched areas <br />and extend restoration into adjoining areas with durable seams that are as invisible as <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.