Orange County NC Website
9/2/2020 <br /> <br /> 013300 - 8 <br />load diagrams if applicable. Provide name and version of software, if any, used for calculations. <br />Include page numbers. <br />2.2 DELEGATED-DESIGN SERVICES <br />A. Performance and Design Criteria: Where professional design services or certifications by a design <br />professional are specifically required of Contractor by the Contract Documents, provide products <br />and systems complying with specific performance and design criteria indicated. <br />1. If criteria indicated are not sufficient to perform services or certification required, submit <br />a written request for additional information to Architect. <br />B. Delegated-Design Services Certification: In addition to Shop Drawings, Product Data, and other <br />required submittals, submit digitally signed PDF electronic file paper copies of certificate, signed <br />and sealed by the responsible design professional, for each product and system specifically <br />assigned to Contractor to be designed or certified by a design professional. <br />1. Indicate that products and systems comply with performance and design criteria in the <br />Contract Documents. Include list of codes, loads, and other factors used in performing <br />these services. <br />PART 3 - EXECUTION <br />3.1 CONTRACTOR'S REVIEW <br />A. Action and Informational Submittals: Review each submittal and check for coordination with <br />other Work of the Contract and for compliance with the Contract Documents. Note corrections <br />and field dimensions. Mark with approval stamp before submitting to Architect. Submittals <br />submitted to Architect without Contractor's stamp indicating their action will be returned without <br />review or comment. <br />B. Project Closeout and Maintenance Material Submittals: See requirements in Section 017700 <br />"Closeout Procedures." <br />C. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name <br />and location, submittal number, Specification Section title and number, name of reviewer, date <br />of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and <br />approved for compliance with the Contract Documents prior to submittal to Architect. <br />D. Mark, highlight, or circle product specific information on product data sheets that contain more <br />than one product type. <br />3.2 ARCHITECT'S ACTION <br />A. Action Submittals: Architect will review each submittal, make marks to indicate corrections or <br />revisions required, and return it. Architect will stamp each submittal with an action stamp and <br />will mark stamp appropriately to indicate action. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03