Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013300 - 1 <br />SECTION 013300 - SUBMITTAL PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes requirements for the submittal schedule and administrative and procedural <br />requirements for submitting Shop Drawings, Product Data, Samples, and other submittals. <br />B. Related Requirements: <br />1. Section 012900 "Payment Procedures" for submitting Applications for Payment and the <br />schedule of values. <br />2. Section 013200 "Construction Progress Documentation" for submitting schedules and <br />reports, including Contractor's construction schedule. <br />3. Section 017823 "Operation and Maintenance Data" for submitting operation and <br />maintenance manuals. <br />1.3 DEFINITIONS <br />A. Action Submittals: Written and graphic information and physical samples that require Architect's <br />responsive action. Action submittals are those submittals indicated in individual Specification <br />Sections as "action submittals." <br />B. Informational Submittals: Written and graphic information and physical samples that do not <br />require Architect's responsive action. Submittals may be rejected for not complying with <br />requirements. Informational submittals are those submittals indicated in individual Specification <br />Sections as "informational submittals." <br />C. File Transfer Protocol (FTP): Communications protocol that enables transfer of files to and from <br />another computer over a network and that serves as the basis for standard Internet protocols. An <br />FTP site is a portion of a network located outside of network firewalls within which internal and <br />external users are able to access files. <br />D. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used <br />for representing documents in a device-independent and display resolution-independent fixed- <br />layout document format. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.