9/2/2020 <br /> <br /> 013200 - 7 <br />10. Stoppages, delays, shortages, and losses. <br />11. Meter readings and similar recordings. <br />12. Emergency procedures. <br />13. Orders and requests of authorities having jurisdiction. <br />14. Change Orders received and implemented. <br />15. Construction Change Directives received and implemented. <br />16. Services connected and disconnected. <br />17. Equipment or system tests and startups. <br />18. Partial completions and occupancies. <br />19. Substantial Completions authorized. <br />B. Site Condition Reports: Immediately on discovery of a difference between site conditions and the <br />Contract Documents, prepare and submit a detailed report. Submit with a Request for <br />Information. Include a detailed description of the differing conditions, together with <br />recommendations for changing the Contract Documents. <br />2.4 SPECIAL REPORTS <br />A. General: Submit special reports directly to Owner and Architect within one day(s) of an <br />occurrence. Distribute copies of report to parties affected by the occurrence. <br />B. Reporting Unusual Events: When an event of an unusual and significant nature occurs at Project <br />site, whether or not related directly to the Work, prepare and submit a special report. List chain <br />of events, persons participating, response by Contractor's personnel, evaluation of results or <br />effects, and similar pertinent information. Advise Owner in advance when these events are known <br />or predictable. <br />PART 3 - EXECUTION <br />3.1 CONTRACTOR'S CONSTRUCTION SCHEDULE <br />A. Contractor's Construction Schedule Updating: At monthly intervals, update schedule to reflect <br />actual construction progress and activities. Issue schedule one week before each regularly <br />scheduled progress meeting. <br />1. Revise schedule immediately after each meeting or other activity where revisions have <br />been recognized or made. Issue updated schedule concurrently with the report of each such <br />meeting. <br />2. Include a report with updated schedule that indicates every change, including, but not <br />limited to, changes in logic, durations, actual starts and finishes, and activity durations. <br />3. As the Work progresses, indicate final completion percentage for each activity. <br />B. Distribution: Distribute copies of approved schedule to Architect, Owner, separate contractors, <br />testing and inspecting agencies, and other parties identified by Contractor with a need-to-know <br />schedule responsibility. <br />1. Post copies in Project meeting rooms and temporary field offices. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03