Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013200 - 6 <br />1. Contractor or subcontractor and the Work or activity. <br />2. Description of activity. <br />3. Main events of activity. <br />4. Immediate preceding and succeeding activities. <br />5. Early and late start dates. <br />6. Early and late finish dates. <br />7. Activity duration in workdays. <br />8. Total float or slack time. <br />9. Average size of workforce. <br />10. Dollar value of activity (coordinated with the schedule of values). <br />G. Schedule Updating: Concurrent with making revisions to schedule, prepare tabulated reports <br />showing the following: <br />1. Identification of activities that have changed. <br />2. Changes in early and late start dates. <br />3. Changes in early and late finish dates. <br />4. Changes in activity durations in workdays. <br />5. Changes in the critical path. <br />6. Changes in total float or slack time. <br />7. Changes in the Contract Time. <br />H. Value Summaries: Prepare two cumulative value lists, sorted by finish dates. <br />1. In first list, tabulate activity number, early finish date, dollar value, and cumulative dollar <br />value. <br />2. In second list, tabulate activity number, late finish date, dollar value, and cumulative dollar <br />value. <br />3. In subsequent issues of both lists, substitute actual finish dates for activities completed as <br />of list date. <br />4. Prepare list for ease of comparison with payment requests; coordinate timing with progress <br />meetings. <br />a. Submit value summary printouts one week before each regularly scheduled progress <br />meeting. <br />2.3 REPORTS <br />A. Daily Construction Reports: Prepare a daily construction report recording the following <br />information concerning events at Project site: <br />1. List of subcontractors at Project site. <br />2. List of separate contractors at Project site. <br />3. Approximate count of personnel at Project site. <br />4. Equipment at Project site. <br />5. Material deliveries. <br />6. High and low temperatures and general weather conditions, including presence of rain or <br />snow. <br />7. Accidents. <br />8. Meetings and significant decisions. <br />9. Unusual events (see special reports). <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.