Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013200 - 4 <br />5. Owner-Furnished Products: Include a separate activity for each product. Include delivery <br />date indicated in Section 011000 "Summary." Delivery dates indicated stipulate the earliest <br />possible delivery date. <br />6. Work Stages: Indicate important stages of construction for each major portion of the Work, <br />including, but not limited to, the following: <br />a. Pre-Con Meeting <br />b. Progress Meetings - OAC (every 2 wks) <br />c. Storm Drainage Inspections - Civil <br />d. Waterproofing Inspections - Civil <br />e. Pre-install Meeting - Landscaping <br />f. Punchlist - GC <br />g. Punchlist Work - GC <br />h. Final Clean <br />i. Warranties Complete <br />C. Upcoming Work Summary: Prepare summary report indicating activities scheduled to occur or <br />commence prior to submittal of next schedule update. Summarize the following issues: <br />1. Unresolved issues. <br />2. Unanswered Requests for Information. <br />3. Rejected or unreturned submittals. <br />4. Notations on returned submittals. <br />5. Pending modifications affecting the Work and Contract Time. <br />D. Recovery Schedule: When periodic update indicates the Work is 14 or more calendar days behind <br />the current approved schedule, submit a separate recovery schedule indicating means by which <br />Contractor intends to regain compliance with the schedule. Indicate changes to working hours, <br />working days, crew sizes, and equipment required to achieve compliance, and date by which <br />recovery will be accomplished. <br />2.2 CONTRACTOR'S CONSTRUCTION SCHEDULE (CPM SCHEDULE) <br />A. General: Prepare network diagrams using AON (activity-on-node) format. <br />B. Startup Network Diagram: Submit diagram within 14 days of date established for the Notice to <br />Proceed. Outline significant construction activities for the first 90 days of construction. Include <br />skeleton diagram for the remainder of the Work and a cash requirement prediction based on <br />indicated activities. <br />C. CPM Schedule: Prepare Contractor's construction schedule using a time-scaled CPM network <br />analysis diagram for the Work. <br />1. Develop network diagram in sufficient time to submit CPM schedule so it can be accepted <br />for use no later than 14 days after date established for the Notice to Proceed. <br />a. Failure to include any work item required for performance of this Contract shall not <br />excuse Contractor from completing all work within applicable completion dates, <br />regardless of Architect's approval of the schedule. <br />2. Conduct educational workshops to train and inform key Project personnel, including <br />subcontractors' personnel, in proper methods of providing data and using CPM schedule <br />information. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.