Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013200 - 3 <br />1. Review software limitations and content and format for reports. <br />2. Verify availability of qualified personnel needed to develop and update schedule. <br />3. Discuss constraints, including interim milestones. <br />4. Review delivery dates for Owner-furnished products. <br />5. Review schedule for work of Owner's separate contracts. <br />6. Review submittal requirements and procedures. <br />7. Review time required for review of submittals and resubmittals. <br />8. Review requirements for tests and inspections by independent testing and inspecting <br />agencies. <br />9. Review time required for Project closeout and Owner startup procedures. <br />10. Review and finalize list of construction activities to be included in schedule. <br />11. Review procedures for updating schedule. <br />1.6 COORDINATION <br />A. Coordinate preparation and processing of schedules and reports with performance of construction <br />activities and with scheduling and reporting of separate contractors. <br />B. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, <br />progress reports, payment requests, and other required schedules and reports. <br />1. Secure time commitments for performing critical elements of the Work from entities <br />involved. <br />2. Coordinate each construction activity in the network with other activities and schedule <br />them in proper sequence. <br />PART 2 - PRODUCTS <br />2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL <br />A. Time Frame: Extend schedule from date established for the Notice to Proceed to date of <br />Substantial Completion. <br />1. Contract completion date shall not be changed by submission of a schedule that shows an <br />early completion date, unless specifically authorized by Change Order. <br />B. Constraints: Include constraints and work restrictions indicated in the Contract Documents and <br />as follows in schedule, and show how the sequence of the Work is affected. <br />1. Phasing: Arrange list of activities on schedule by phase. <br />2. Work under More Than One Contract: Include a separate activity for each contract. <br />3. Work by Owner: Include a separate activity for each portion of the Work performed by <br />Owner. <br />4. Products Ordered in Advance: Include a separate activity for each product. Include delivery <br />date indicated in Section 011000 "Summary." Delivery dates indicated stipulate the earliest <br />possible delivery date. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.