Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013200 - 2 <br />E. Event: The starting or ending point of an activity. <br />F. Float: The measure of leeway in starting and completing an activity. <br />1. Float time is not for the exclusive use or benefit of either Owner or Contractor, but is a <br />jointly owned, expiring Project resource available to both parties as needed to meet <br />schedule milestones and Contract completion date. <br />2. Free float is the amount of time an activity can be delayed without adversely affecting the <br />early start of the successor activity. <br />3. Total float is the measure of leeway in starting or completing an activity without adversely <br />affecting the planned Project completion date. <br />G. Resource Loading: The allocation of manpower and equipment necessary for the completion of <br />an activity as scheduled. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Format for Submittals: Submit required submittals in the following format: <br />1. Working electronic copy of schedule file, where indicated. <br />2. PDF electronic file. <br />B. CPM Reports: Concurrent with CPM schedule, submit each of the following reports. Format for <br />each activity in reports shall contain activity number, activity description, cost and resource <br />loading, original duration, remaining duration, early start date, early finish date, late start date, <br />late finish date, and total float in calendar days. <br />1. Activity Report: List of all activities sorted by activity number and then early start date, or <br />actual start date if known. <br />2. Logic Report: List of preceding and succeeding activities for all activities, sorted in <br />ascending order by activity number and then early start date, or actual start date if known. <br />3. Total Float Report: List of all activities sorted in ascending order of total float. <br />4. Earnings Report: Compilation of Contractor's total earnings from the Notice to Proceed <br />until most recent Application for Payment. <br />C. Construction Schedule Updating Reports: Submit with Applications for Payment. <br />D. Daily Construction Reports: Submit at weekly intervals. <br />E. Site Condition Reports: Submit at time of discovery of differing conditions. <br />F. Special Reports: Submit at time of unusual event. <br />1.5 QUALITY ASSURANCE <br />A. Prescheduling Conference: Conduct conference at Project site to comply with requirements in <br />Section 013100 "Project Management and Coordination." Review methods and procedures <br />related to the preliminary construction schedule and Contractor's construction schedule, <br />including, but not limited to, the following: <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03