Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013200 - 1 <br />SECTION 013200 - CONSTRUCTION PROGRESS DOCUMENTATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for documenting the progress of <br />construction during performance of the Work, including the following: <br />1. Contractor's construction schedule. <br />2. Construction schedule updating reports. <br />3. Daily construction reports. <br />4. Site condition reports. <br />5. Special reports. <br />B. Related Requirements: <br />1. Section 013300 "Submittal Procedures" for submitting schedules and reports. <br />2. Section 014000 "Quality Requirements" for submitting a schedule of tests and inspections. <br />1.3 DEFINITIONS <br />A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, <br />and controlling the construction project. Activities included in a construction schedule consume <br />time and resources. <br />1. Critical Activity: An activity on the critical path that must start and finish on the planned <br />early start and finish times. <br />2. Predecessor Activity: An activity that precedes another activity in the network. <br />3. Successor Activity: An activity that follows another activity in the network. <br />B. Cost Loading: The allocation of the schedule of values for the completion of an activity as <br />scheduled. The sum of costs for all activities must equal the total Contract Sum unless otherwise <br />approved by Architect. <br />C. CPM: Critical path method, which is a method of planning and scheduling a construction project <br />where activities are arranged based on activity relationships. Network calculations determine <br />when activities can be performed and the critical path of Project. <br />D. Critical Path: The longest connected chain of interdependent activities through the network <br />schedule that establishes the minimum overall Project duration and contains no float. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.