Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 013100 - 1 <br />SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Administrative and supervisory personnel. Section includes administrative provisions for <br />coordinating construction operations on Project including, but not limited to, the following: <br />1. General coordination procedures. <br />2. Requests for Information (RFIs). <br />3. Project meetings. <br />B. Related Requirements: <br />1. Section 013200 "Construction Progress Documentation" for preparing and submitting <br />Contractor's construction schedule. <br />2. Section 017300 "Execution" for procedures for coordinating general installation and field- <br />engineering services, including establishment of benchmarks and control points. <br />3. Section 017700 "Closeout Procedures" for coordinating closeout of the Contract. <br />1.3 DEFINITIONS <br />A. RFI: Request for Information from Contractor seeking information required by or clarifications <br />of the Contract Documents. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each <br />portion of the Work, including those who are to furnish products or equipment fabricated to a <br />special design. Include the following information in tabular form: <br />1. Name, address, and telephone number of entity performing subcontract or supplying <br />products. <br />2. Number and title of related Specification Section(s) covered by subcontract. <br />3. Drawing number and detail references, as appropriate, covered by subcontract. <br />B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key <br />personnel assignments, including superintendent and other personnel in attendance at Project site. <br />Identify individuals and their duties and responsibilities; list addresses and telephone numbers, <br />including office and cellular telephone numbers and e-mail addresses. Provide names, addresses, <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.