9/2/2020 <br /> <br /> 012620 - 2 <br />1.4 Documentation and Submittals <br />A. Provide a Weather Delay Report, indicating for each calendar month the days on which <br />construction activity affecting the critical path of the Work was prevented by weather conditions. <br />Provide written general cause; and indicate the measurement of precipitation, temperature, wind, <br />or other influencing factors, using NOAA climate data and the construction activity that was <br />scheduled and delayed. At the end of the month, add up the number of days delay, subtract the <br />baseline number given and show the resulting claimable days. Submit a copy of the completed <br />report with the next application for payment. Claims for time extension based upon weather <br />delays will be denied if a submitted report does not corroborate the claim or if no report was <br />submitted when it was required in accordance with this paragraph. Total time extension will be <br />accumulated throughout the project duration from each monthly report. Extension for weather <br />delays will be reviewed in conjunction with overall project completion based upon contracted <br />days and substantial completion date. Claim will be accessed at the end of the project. <br />B. Submit daily jobsite work logs showing which and to what extent construction activities have <br />been affected by weather included in the regular reports. <br />C. Submit actual weather data to support claim for time extension obtained from nearest NOAA <br />weather station or other independently verified source approved by Architect at beginning of <br />project. <br />PART 2 - PRODUCTS <br />PART 3 - EXECUTION <br />END OF SECTION 012620 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03