Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 012620 - 2 <br />1.4 Documentation and Submittals <br />A. Provide a Weather Delay Report, indicating for each calendar month the days on which <br />construction activity affecting the critical path of the Work was prevented by weather conditions. <br />Provide written general cause; and indicate the measurement of precipitation, temperature, wind, <br />or other influencing factors, using NOAA climate data and the construction activity that was <br />scheduled and delayed. At the end of the month, add up the number of days delay, subtract the <br />baseline number given and show the resulting claimable days. Submit a copy of the completed <br />report with the next application for payment. Claims for time extension based upon weather <br />delays will be denied if a submitted report does not corroborate the claim or if no report was <br />submitted when it was required in accordance with this paragraph. Total time extension will be <br />accumulated throughout the project duration from each monthly report. Extension for weather <br />delays will be reviewed in conjunction with overall project completion based upon contracted <br />days and substantial completion date. Claim will be accessed at the end of the project. <br />B. Submit daily jobsite work logs showing which and to what extent construction activities have <br />been affected by weather included in the regular reports. <br />C. Submit actual weather data to support claim for time extension obtained from nearest NOAA <br />weather station or other independently verified source approved by Architect at beginning of <br />project. <br />PART 2 - PRODUCTS <br />PART 3 - EXECUTION <br />END OF SECTION 012620 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.