Orange County NC Website
9/2/2020 <br /> <br /> 012600 - 3 <br />B. Documentation: Maintain detailed records on a time and material basis of work required by the <br />Construction Change Directive. <br />1. After completion of change, submit an itemized account and supporting data necessary to <br />substantiate cost and time adjustments to the Contract. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 012600 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03