Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 012600 - 1 <br />SECTION 012600 - CONTRACT MODIFICATION PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for handling and processing <br />Contract modifications. <br />B. Related Requirements: <br />1. Section 012500 "Substitution Procedures" for administrative procedures for handling <br />requests for substitutions made after the Contract award. <br />1.3 MINOR CHANGES IN THE WORK <br />A. Architect will issue supplemental instructions authorizing minor changes in the Work, not <br />involving adjustment to the Contract Sum or the Contract Time, as "Architect's Supplemental <br />Instructions." <br />1.4 PROPOSAL REQUESTS <br />A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed <br />changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If <br />necessary, the description will include supplemental or revised Drawings and Specifications. <br />1. Work Change Proposal Requests issued by Architect are not instructions either to stop <br />work in progress or to execute the proposed change. <br />2. Within time specified in Proposal Request after receipt of Proposal Request, submit a <br />quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary <br />to execute the change. <br />a. Include a list of quantities of products required or eliminated and unit costs, with <br />total amount of purchases and credits to be made. If requested, furnish survey data <br />to substantiate quantities. <br />b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade <br />discounts. <br />c. Include costs of labor and supervision directly attributable to the change. <br />d. Include an updated Contractor's construction schedule that indicates the effect of the <br />change, including, but not limited to, changes in activity duration, start and finish <br />times, and activity relationship. Use available total float before requesting an <br />extension of the Contract Time. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.