Orange County NC Website
9/2/2020 <br /> <br /> 012500 - 2 <br />b. Coordination information, including a list of changes or revisions needed to other <br />parts of the Work and to construction performed by Owner and separate contractors, <br />that will be necessary to accommodate proposed substitution. <br />c. Detailed comparison of significant qualities of proposed substitution with those of <br />the Work specified. Include annotated copy of applicable Specification Section. <br />Significant qualities may include attributes such as performance, weight, size, <br />durability, visual effect, sustainable design characteristics, warranties, and specific <br />features and requirements indicated. Indicate deviations, if any, from the Work <br />specified. <br />d. Product Data, including drawings and descriptions of products and fabrication and <br />installation procedures. <br />e. Samples, where applicable or requested. <br />f. Certificates and qualification data, where applicable or requested. <br />g. List of similar installations for completed projects with project names and addresses <br />and names and addresses of architects and owners. <br />h. Material test reports from a qualified testing agency indicating and interpreting test <br />results for compliance with requirements indicated. <br />i. Research reports indicating evidence of compliance to the building code(s) in effect <br />for Project, from 2018 NCSBC 's. <br />j. Detailed comparison of Contractor's construction schedule using proposed <br />substitution with products specified for the Work, including effect on the overall <br />Contract Time. If specified product or method of construction cannot be provided <br />within the Contract Time, include letter from manufacturer, on manufacturer's <br />letterhead, stating date of receipt of purchase order, lack of availability, or delays in <br />delivery. <br />k. Cost information, including a proposal of change, if any, in the Contract Sum. <br />l. Contractor's certification that proposed substitution complies with requirements in <br />the Contract Documents except as indicated in substitution request, is compatible <br />with related materials, and is appropriate for applications indicated. <br />m. Contractor's waiver of rights to additional payment or time that may subsequently <br />become necessary because of failure of proposed substitution to produce indicated <br />results. <br />3. Architect's Action: If necessary, Architect will request additional information or <br />documentation for evaluation within five days of receipt of a request for substitution. <br />Architect will notify Contractor of acceptance or rejection of proposed substitution within <br />10 days of receipt of request, or seven days of receipt of additional information or <br />documentation, whichever is later. <br />a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's <br />Supplemental Instructions for minor changes in the Work. <br />b. Use product specified if Architect does not issue a decision on use of a proposed <br />substitution within time allocated. <br />1.5 QUALITY ASSURANCE <br />A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution <br />with related products and materials. Engage a qualified testing agency to perform compatibility <br />tests recommended by manufacturers. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03