Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 012500 - 1 <br />SECTION 012500 - SUBSTITUTION PROCEDURES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements for substitutions. <br />B. Related Requirements: <br />1. Section 016000 "Product Requirements" for requirements for submitting comparable <br />product submittals for products by listed manufacturers. <br />C. Section 012100 "Allowances" - NO Substitutions allowed or even considered for Allowances <br />listed in Section 012100. <br />1. If products are found to be discontinued, contact Architect for alternate products. <br />1.3 DEFINITIONS <br />A. Substitutions: Changes in products, materials, equipment, and methods of construction from those <br />required by the Contract Documents and proposed by Contractor. <br />1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed <br />Project conditions, such as unavailability of product, regulatory changes, or unavailability <br />of required warranty terms. <br />2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not <br />required in order to meet other Project requirements but may offer advantage to Contractor <br />or Owner. <br />1.4 ACTION SUBMITTALS <br />A. Substitution Requests: Submit request for consideration. Identify product or fabrication or <br />installation method to be replaced. Include Specification Section number and title and Drawing <br />numbers and titles. <br />1. Substitution Request Form: Use CSI Form 13.1A. <br />2. Documentation: Show compliance with requirements for substitutions and the following, <br />as applicable: <br />a. Statement indicating why specified product or fabrication or installation cannot be <br />provided, if applicable. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.