Orange County NC Website
9/2/2020 <br /> <br /> 012100 - 3 <br />3.2 PREPARATION <br />A. Coordinate materials and their installation for each allowance with related materials and <br />installations to ensure that each allowance item is completely integrated and interfaced with <br />related work. <br />3.3 SCHEDULE OF ALLOWANCES <br />A. None at this time. <br />END OF SECTION 012100 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03