Orange County NC Website
9/2/2020 <br /> <br /> 012100 - 1 <br />SECTION 012100 - ALLOWANCES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and other Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes administrative and procedural requirements governing allowances. <br />1. Certain items are specified in the Contract Documents by allowances. Allowances have <br />been established in lieu of additional requirements and to defer selection of actual materials <br />and equipment to a later date when direction will be provided to Contractor. If necessary, <br />additional requirements will be issued by Change Order. <br />B. Types of allowances include the following: <br />1. Lump-sum allowances. <br />C. Related Requirements: <br />1. Divisions 3 through 26 sections for items of Work covered by allowances. <br />1.3 SELECTION AND PURCHASE <br />A. At the earliest practical date after award of the Contract, advise Architect of the date when final <br />selection and purchase of each product or system described by an allowance must be completed <br />to avoid delaying the Work. <br />B. Purchase products and systems selected by Architect from the designated supplier. <br />1.4 INFORMATIONAL SUBMITTALS <br />A. Submit invoices or delivery slips to show actual quantities of materials delivered to the site for <br />use in fulfillment of each allowance. <br />B. Submit time sheets and other documentation to show labor time and cost for installation of <br />allowance items that include installation as part of the allowance. <br />C. Coordinate and process submittals for allowance items in same manner as for other portions of <br />the Work. <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03