Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9/2/2020 <br /> <br /> 011000 - 4 <br />E. Employee Identification: Provide identification tags for Contractor personnel working on Project <br />site. Require personnel to use identification tags at all times. <br />1.8 SPECIFICATION AND DRAWING CONVENTIONS <br />A. Specification Content: The Specifications use certain conventions for the style of language and <br />the intended meaning of certain terms, words, and phrases when used in particular situations. <br />These conventions are as follows: <br />1. Imperative mood and streamlined language are generally used in the Specifications. The <br />words "shall," "shall be," or "shall comply with," depending on the context, are implied <br />where a colon (:) is used within a sentence or phrase. <br />2. Specification requirements are to be performed by Contractor unless specifically stated <br />otherwise. <br />B. Division 01 General Requirements: Requirements of Sections in Division 01 apply to the Work <br />of all Sections in the Specifications. <br />C. Drawing Coordination: Requirements for materials and products identified on Drawings are <br />described in detail in the Specifications. One or more of the following are used on Drawings to <br />identify materials and products: <br />1. Terminology: Materials and products are identified by the typical generic terms used in the <br />individual Specifications Sections. <br />2. Abbreviations: Language used in the Specifications and other Contract Documents is <br />abbreviated. Words and meanings shall be interrupted as appropriate. Words implied, but <br />not stated, shall be inferred as the sense requires scheduled on Drawings. Singular words <br />shall be interrupted as plural, and plural words shall be interpreted as singular where <br />applicable as the context of the Contract Documents indicates. <br />3. Keynoting: Materials and products are identified by reference keynotes referencing <br />Specification Section numbers found in this Project Manual. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION 011000 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.