Browse
Search
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-661-E-Hamlett Associates-RFP5399 - Whitted Stormwater Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:43:28 PM
Creation date
11/21/2023 2:39:10 PM
Metadata
Fields
Template:
Contract
Date
11/14/2023
Contract Starting Date
11/14/2023
Contract Ending Date
11/15/2023
Contract Document Type
Contract
Amount
$3,600.00
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
364
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BYDATEREVISIONS132456PROJECT NO. <br />SHEET NO.PROJECT ENGINEER/ARCHITECTPROJECT MANAGERDRAWN BY7DRAWING NAME: <br />20-0014WHITTED COMPLEXHILLSBOROUGH, NC, 27278300 WEST TRYON STSITE PLANCreatively Inspired - Technically ExecutedLicense #: P-0339320 Executive CourtHillsborough, NC 27278-8551Voice: (919) 732-3883 Fax: (919) 732-6676www.summitde.netFIRST ISSUE DATEDAS (DON.SEVER@SUMMITDE.NET)MGA (MALLORY.ARMFIELD@SUMMITDE.NET)06-08-2020MGA (MALLORY.ARMFIELD@SUMMITDE.NET)ENGINEERING, INC.20-0014_LS <br />L-2 LANDSCAPE DETAILSGENERAL LANDSCAPING NOTES: <br />1.LANDSCAPE CONTRACTOR SHALL HAVE ALL UNDERGROUND UTILITIES LOCATIONS LOCATED PRIOR TO INSTALLING PLANT MATERIAL. <br />2.CONTRACTOR SHALL COMPLY WITH SIZING AND GRADING STANDARDS OF THE LATEST EDITION OF THE "AMERICAN STANDARD FOR NURSERY STOCK" <br />BY THE AMERICAN ASSOCIATION OF NURSERYMEN (AAN). <br />3.CONTRACTOR SHALL NOT PLANT NEW PLANT MATERIAL IN CRITICAL ROOT ZONES OF EXISTING TREES TO BE SAVED AND PROTECTED ON SITE. <br />SCHEDULE FOR PLANT HOLE SIZE <br />6"12"30" OR GREATER <br />5" TO 30"4"8" <br />YXBARE ROOT, CONTAINER <br />OR BALL SIZE <br />X <br />Y <br />LOOSEN SOIL ON SIDES <br />AND BOTTOM OF <br />PLANTING HOLE <br />BACKFILL SOIL AS IN NOTES <br />EXISTING SOIL LEVEL <br />3" SAUCER <br />3" TRIPLE SHREDDED <br />HARDWOOD MULCH <br />SHRUB PLANTING NOTES <br />PRUNING - CLEANLY PRUNE DAMAGED BRANCHES AND ROOTS AT THIS TIME. <br />ADDITIONAL PRUNING SHOULD BE ONLY FOR SHAPING PURPOSES. <br />PLANTING - ALL SYNTHETIC MATERIALS SHOULD BE REMOVED FROM THE <br />ROOTS, TRUNK OR CROWN OF THE PLANT. THE ROOT BALL MEDIUM SHOULD <br />BE SHAKEN GENTLY FROM THE ROOT BALL IF IT IS A SOILESS MIXTURE. <br />LOOSEN AND SPREAD THE ROOTS IN THE PLANTING HOLE. DAMAGED ROOTS <br />AND ROOTS WHICH ENCIRCLE THE TRUNK SHOULD BE CLEANLY PRUNED. SET <br />THE PLANT SO THAT IT WILL BE AT ITS ORIGINAL DEPTH OR SLIGHTLY ABOVE <br />THE EXISTING GRADE. BACKFILL WITH SOIL FROM THE HOLE. TAMP AND WATER <br />THE SOIL TO PREVENT AIR POCKETS. DO NOT AMEND THE SOIL AT THIS TIME <br />EXCEPT TO ADJUST THE PH. <br />STAKING - STAKE ONLY LARGER PLANTS THAT WILL CATCH THE WIND. <br />EVERGREENS MAY NEED ATTENTION WHERE DECIDUOUS PLANTS DO NOT. <br />WATERING - THE BACKFILL AND ROOTS OF ALL NEWLY SET PLANT MATERIAL <br />SHOULD BE WATERED AS BACKFILLING IS DONE SO THAT THE SOIL AND ROOTS <br />ARE THOROUGHLY SOAKED. <br />TREE PLANTING AND STAKING <br />STAKING - TREES WILL BECOME STRONGER FASTER WHEN THE TOP 2/3 OF THE TREE IS FREE TO SWAY. TIE THE TRUNK LOOSELY WITH WIDE STRIPS OF RUBBER OR CLOTH ABOUT 1/3 UP THE TRUNK <br />AND TIE TO THREE STAKES POSITIONED EVENLY AROUND THE TRUNK. STAKES SHOULD BE DRIVEN DEEPLY INTO THE GROUND TO PREVENT DISLODGING. CHECK AT LEAST EVERY THREE MONTHS FOR <br />BINDING OR OTHER PROBLEMS. STAKES AND TIES SHOULD BE REMOVED SIX MONTHS TO ONE YEAR AFTER PLANTING. <br />WRAPPING - WRAP ONLY THIN BARKED TREES IF THEY HAVE BEEN REMOVED FROM SHADE TO WHERE THE TRUNK IS EXPOSED TO DIRECT SUNLIGHT DURING THE DAY. WRAPPING SHOULD BEGIN AT THE <br />BOTTOM AND WORK UP. WRAPPING MATERIAL SHOULD NOT TRAP OR HOLD WATER. <br />PRUNING - CLEANLY PRUNE DAMAGED BRANCHES AND ROOTS AT THIS TIME. ADDITIONAL PRUNING SHOULD BE ONLY FOR SHAPING PURPOSES. <br />PLANTING - ALL SYNTHETIC MATERIALS SHALL BE CLEARED FROM THE ROOTS, TRUNK AND CROWN OF THE PLANT. THE ROOT BALL MEDIUM SHOULD BE SHAKEN GENTLY FROM THE ROOT BALL IF IT IS A <br />SOILESS MIXTURE. LOOSEN AND SPREAD THE ROOTS IN THE PLANTING HOLE. DAMAGED ROOTS AND ROOTS WHICH ENCIRCLE THE TRUNK SHOULD BE CLEANLY PRUNED. SET THE PLANT SO THAT IT <br />WILL BE AT ITS ORIGINAL DEPTH OR SLIGHTLY ABOVE EXISTING GRADE. BACKFILL WITH SOIL FROM THE HOLE. TAMP AND WATER THE SOIL TO PREVENT AIR POCKETS. DO NOT AMEND THE SOIL AT THIS <br />POINT EXCEPT TO AMEND THE PH. <br />WATERING - THE BACKFILL AND ROOTS OF ALL NEWLY SET PLANTS SHOULD BE WATERED AS BACKFILLING IS BEING DONE SO THAT THE SOIL AND ROOTS ARE THOROUGHLY SOAKED. <br />3' SAUCER <br />SCARIFY SIDES AND BOTTOM <br />OF HOLE <br />BACKFILL SOIL <br />SOIL SURFACE <br />NOTES <br />REMOVE BURLAP FROM TOP OF <br />ROOT BALL BEFORE BACKFILLING <br />AROUND BALL IS COMPLETED <br />ALL TREES WHICH ARE SMOOTH <br />BARKED AT THE TIME OF PLANTING <br />AND HAVE MORE THAN 2' OF CLEAR <br />TRUNK SHALL BE WRAPPED <br />ALL TREE WRAPPING SHALL EXTEND <br />FROM THE TOP OF THE BACKFILL TO <br />THE LOWERMOST TREE BRANCHES <br />BARE ROOT, CONTAINER <br />OR BALL SIZE <br />X Y <br />8"4"5" TO 30" <br />30" OR GREATER 12"6" <br />SCHEDULE FOR PLANT HOLE SIZE <br />3" - 6" TRIPLE SHREDDED <br />HARDWOOD MULCH <br />DOUBLE STRAND 12 GAUGE <br />WIRE: LEAVE SLACK CLOTH OR <br />RUBBER TIE <br />STAKES <br />X <br />Y <br />2"-4" RIVER ROCK <br />ON LANDSCAPE FABRIC <br />9/2/2020 <br />DocuSign Envelope ID: 7D9ACD4F-8F6C-42B6-9ADB-C60032DB6D03
The URL can be used to link to this page
Your browser does not support the video tag.