Orange County NC Website
PO # <br />300 W Tryon St <br />Bldg B 3rd Floor Office 10 <br />Hillsborough NC 27278-2438 <br />Orange County Sportsplex <br />101 Meadowlands Dr <br />Hillsborough NC 27278-8500 Orange County Asset Management <br />Orange County Sportsplex - 25464 LPG Net 30 <br />08:00 AM <br />Commercial <br />Job Name <br /> Billing Information <br />Terms TypeSales Rep <br />Scheduled StartRoute <br /> Service Information <br />Service Call - 2023 Annual Inspection Repairs <br /> Job Type <br />09:00 AM <br />End <br />Storm Water <br />Class <br />Proposal <br />Call Ahead Confirmed <br />(919) 245-2628 Phone: <br />Alt Phone: <br />Fax: <br />Alt Contact: <br />E-Mail:abarnes@orangecountync.gov Marketing Campaign <br />Contact:Angel Barnes <br />Triangle Pond Management LLC <br />405 S Rogers Ln <br />Raleigh NC 27610 <br />Phone: (919) 398-3221 <br />Fax: (919) 926-9279 <br />office@trianglepondmanagement.com <br />www.trianglepondmanagement.com <br /> Item Quantity Rate Amount <br />Service Call - A: <br />- RAKE/REMOVE EXCESS LEAF/STICKS, TRASH AND MISC. DEBRISFROM <br />ENTIRETY OF BASIN BOTTOM AND SLOPES. <br />1 $400.0000 $400.00 <br />Service Call - B: <br />- AT EAST SIDE SLOPE, WEED OUT ERRANT VEG (INCL. KUDZU ON WAX <br />MYRTLES & PINE SAPLINGS) & RAKE REMOVE DEBRIS. <br />- COVER BARE AREAS WITH PINE STRAW. <br />1 $600.0000 $600.00 <br />Service Call - C: REMEDIATION REQUIRED AT WEST SIDE SLOPE: <br />1. The west side slope receives sheet flow from the parking lot over its length. <br />Poor soils, shade, tree root competition all have contributed to lack of <br />vegetation. As such, the side slope is bare and eroding in many areas, and <br />resulting in compromising sediment deposition to the highly vulnerable basin <br />bottom. Implement the following repairs: <br />2. Add quality clay fill and mechanically tamp to restore uniform grade for <br />eroded portions of west inner slope. <br />3. Securely staple non-woven geotextile fabric over entire slope where bare <br />areas are present; tuck fabric into grade at upstream end and staple securely in <br />place to prevent undermining from incoming sheet flow (critical). <br />4. Securely staple NAG SC250 TRM (NO substitutes) over top of the non-woven <br />geotextile fabric; staple securely in place, and especially at the upstream end to <br />prevent undermining from incoming flows. <br />1 $2,150.0000 $2,150.00 <br />Service Call - D: <br />- BROADCAST CONTRACTOR’S SEED MIX OVER ENTIRE BASIN BOTTOM <br />1 $180.0000 $180.00 <br />SCM Inspection - SCM Re-Inspection and Reporting, Photographic Journal 1 $300.0000 $300.00 <br />$0.00 <br />$3,630.00 <br />NC Sales Tax 7.25 <br />Total: <br />* Unless noted otherwise this is a package offer. Opting out or editing a single line item could affect the necessary labor or materials needed of other <br />line items. Please contact us if you have any questions or concerns. <br />* Scheduled start and ends times are approximations actual times may vary. All scheduled services are subject to weather cooperation. You will be <br />notified if your services need to be rescheduled. <br />Terms of service: <br />• A Non-Refundable Deposits could be required depending on the cost/nature of service. If a deposit is required payment must be made before <br />services can be scheduled. If the customer cancels the job more than 2 days prior to the schedule date, the deposit will be held as a credit for up to <br />Job Subtotal:$3,630.00 <br />Payment Total:$0.00 <br />DocuSign Envelope ID: E88D3614-D81A-4354-A13B-CF79D436B6A5