Browse
Search
2023-635-E-AMS-Siemens Industry- Emergency Services Warehouse - Add Carbon Monoxide Detector
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-635-E-AMS-Siemens Industry- Emergency Services Warehouse - Add Carbon Monoxide Detector
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 10:01:05 AM
Creation date
11/21/2023 10:01:01 AM
Metadata
Fields
Template:
Contract
Date
10/26/2023
Contract Starting Date
10/26/2023
Contract Ending Date
10/31/2023
Contract Document Type
Contract
Amount
$5,560.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 04/23 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUEST <br />NORTH CAROLINA <br /> <br />______________________________________________________________________________________________________________ <br />Date: 10/30/2023 Project: PNW ES HVAC Controls Add Change Order No. 01 Department: AMS Department Address: <br />306 Revere Road, Hillsborough NC 27278 Project: PNW ES HVAC Controls ADD Contractor: Siemens Industry, Inc Contractor Address: <br />215 Southport Drive, Suite 900, Morrisville, NC 27560 Effective date of original contract: March 5, 2023 <br /> <br />This change order increases decreases the contract time by 126 days. Check here if no impact to contract time . <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of substantial completion is: <br />December 29, 2023 <br />_______________________________________________________________________________________________________________ <br /> <br />Full Description of Change: Provide and install one (1) Carbon Monoxide Sensor in the high bay area of the warehouse. This sensor shall be added to the <br />existing Building Automation System and configured to start the exhaust fan system in the event the sensor level increase to above 35 PPM. <br /> <br />Reason for Change: This change is to ensure that the exhaust system is only working when required in order to prevent additional humidity from <br />entering the warehouse. This will allow the dehumidifiers to only run when necessary versus 100% of the time. This will also ensure the safety of staff <br />now that vehicles are being parked inside the warehouse from the exhaust fumes. <br />_______________________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 18,700.00 <br /> <br />Contract sum prior to this change order: $ 18,700.00 <br /> <br />Amount of this change order: $ 5,560.00 <br /> <br />Total sum of the contract including this change order: $ 24,260.00 <br /> <br />_______________________________________________________________________________________________________________ <br />This change order is executed to amend the contract time or contract sum. It shall not be construed to impact the original contract, project, services, or <br />work in any other manner. All other terms of the Original Contract remain in effect. <br />Approved and executed this 30th day of October, 2023. <br />_______________________________ _____________________________ _____________________________ <br />Contractor Owner Architect (when retained) <br /> <br />By:____________________________ By:___________________________ By:___________________________ <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 8B27B710-F4E5-4D1F-9CA0-BE1B893D4EDF <br />10/26/2023 <br />Branch General Manager County Manager <br />10/31/2023
The URL can be used to link to this page
Your browser does not support the video tag.