Browse
Search
2023-626-E-Planning Dept- Bitting Electric-Installation of 10-kW generator, 100-amp automatic transfer switch, and 100-gallon propane tank at Lake Orange
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2023
>
2023-626-E-Planning Dept- Bitting Electric-Installation of 10-kW generator, 100-amp automatic transfer switch, and 100-gallon propane tank at Lake Orange
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 9:55:06 AM
Creation date
11/21/2023 9:54:42 AM
Metadata
Fields
Template:
Contract
Date
11/1/2023
Contract Starting Date
11/1/2023
Contract Ending Date
11/2/2023
Contract Document Type
Contract
Amount
$13,530.00
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bitting Electric, Inc. <br />1000 Northgate Ct <br />Morrisville, NC 27560 <br />PROPOSAL <br />5095275000010394006 <br />Bill To <br />Orange County Planning and Inspections <br />131 W. Margaret Lane, Suite 201 <br />Hillsborough, NC 27278 <br />Project <br />Orange County Lake Orange 10KW generator install <br />, <br /> <br /> <br />We Hereby Submit Specifications and Estimates for: <br />Labor and materials to install a 10KW generator and (1) 100-amp ATS <br />The following is included: <br />• Permits and inspections <br />• Install 10Kw generator provided by the owner <br />• Rough in underground conduits in the generator pad provided by others <br />• Install the owners 100-amp ATS <br />• Install the owners 100-gallon propane tank delivered by Bitting on the day of installation (fuel fill by others) <br />• Repair (1) post leg only <br />• Add more support for the wood rack <br />• Trenching and backfilling <br />• ADDER if needed: $7200.00 Rigid post rack with (3) support beams, hauling, and concrete for the supports. Demolition of the <br />existing rack and equipment, installation of the old/new equipment on the new rack. <br />• Conduit and feeders <br />• Straps and supports <br />• Boxes and fittings <br />• Grounding per the NEC <br /> <br />Notes: <br />• This quote is for the installation of the previously purchased equipment <br />• All work is to be performed during normal business hours <br />Removed the cost for the prefabricated generator pad. Owners' contractor will install a poured pad with Bitting providing rough in <br />of the underground conduits. <br /> <br />Contact Name Christopher Sandt <br />Valid Until Nov 6, 2023 <br />Estimator Chris Boyle <br />Amount $ 13,530.00 <br />Payment Terms Net 30 <br /> Contract Total $ 13,530.00 <br />5095275000010394006 <br />1 <br />Date: October 23, 2023 <br />EXHIBIT A - SCOPE OF WORK <br />DocuSign Envelope ID: 8FE79AD7-03A3-4295-AECE-2E4059A3494B
The URL can be used to link to this page
Your browser does not support the video tag.