Orange County <br />Lake Orange Auxiliary Spillway Concrete Repairs CPS <br /> <br /> <br />Project 23210035 / August 21, 2023 Page 3 Schnabel Engineering South, P.C. <br />• A site visit to review the limits of the repair areas after the contractor has prepared at least the <br />majority of the repair areas, but prior to placing any grout patch material, to review the process for <br />preparing the repair areas for grouting, mixing the grout patch material, and placement of the <br />grout patch material. <br />• An additional site visit has been budgeted for either review of repair area limits, or inspection of <br />completed repairs, as deemed necessary during construction. <br />• A site visit after the contractor has indicated they believe they are substantially complete, to <br />inspect the work performed and develop a punch list of items to be completed prior to final <br />completion. At the substantial completion site visit, information will be collected for preparation of <br />the Record Drawings. <br />• It is assumed a representative from the County will perform the final inspection to confirm that the <br />identified punch list items have been completed. <br />Task 3 – Construction Closeout <br />Schnabel will utilize information provided by the contractor and collected during the site visits performed <br />during construction to prepare Record Drawings for the project. The Record Drawings will be provided to <br />the County for their review, and any comments on the draft Record Drawings will be addressed. The <br />Record Drawings will be submitted to NCDEQ Dam Safety, as required by the stipulations identified <br />above. In addition to the Record Drawings, Schnabel will prepare a certification letter stating that the work <br />has been completed in accordance with approved plans, specifications, and other requirements. The <br />certification letter and Record Drawings will be submitted to NCDEQ Dam Safety for their review and <br />approval. <br />EXCLUSIONS <br />Services not specifically identified above are not included in the scope of services under this agreement. <br />The following services are not included in our proposed scope, but we can be provide a proposal for <br />these services upon request: <br /> <br />• Attendance at additional meetings or site visits. <br />• Design of additional repair methods or modifications to the current repair methods. <br />SCHEDULE <br />It is our understanding the project has been advertised for bid as of August 10, 2023, therefore bid <br />assistance services will be performed as questions or substitution requests are received. Construction <br />phase services will be performed in coordination with the County and based on the contractor’s schedule <br />and performance. <br />FEES <br />Schnabel’s fees are summarized below and are for the specific scope of services detailed herein. <br /> <br />DocuSign Envelope ID: 06BFB476-928C-4E3D-BDCF-74A925087AB9