Browse
Search
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2023
>
Agenda - 11-14-2023 Business Meeting
>
Agenda 11-14-23; 7-b - US 70 Multimodal Corridor Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2023 12:04:52 PM
Creation date
11/9/2023 12:09:02 PM
Metadata
Fields
Template:
BOCC
Date
11/14/2023
Meeting Type
Business
Document Type
Agenda
Agenda Item
7-b
Document Relationships
Agenda for November 14, 2023 BOCC Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2023\Agenda - 11-14-2023 Business Meeting
ORD-2023-041-Designation of the Davis Cotton Gin and press as an Orange County Historic Landmark
(Message)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2020-2029\2023
OTHER-2023-073-E-Orange County FY 2025 - Global Agreement for Operating
(Message)
Path:
\Board of County Commissioners\Various Documents\2020 - 2029\2023
RES-2023-073-Resolution to Amend Involuntary Commitment Transportation Plan
(Message)
Path:
\Board of County Commissioners\Resolutions\2020-2029\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
98 <br /> lib <br /> 1.7 Relevant Plans <br /> This section summarizes relevant planning and policy efforts,focusing on the most recent transportation-related plans, <br /> and on those specific elements that affect the US 70 Corridor Study,or which could be affected by it. <br /> 1.7.1 Regional/Long Range Transportation Plans <br /> 2022 Burlington Graham Metropolitan Planning Organization Comprehensive Transportation Plan (CTP) <br /> This plan addresses the aspirational transportation improvements in the Burlington-Graham Metropolitan Planning <br /> Organization(BGMPO)area for the next 25 to 30 years. The noted recommendations within the study area include both <br /> roadway and bicycle improvements: <br /> ➢ Modernize US 70 by adding a wider paved shoulder to improve safety and mobility—creating a transit corridor <br /> from NC 119 to Supper Club Road. <br /> ➢ Widen NC 119 to a four-lane,divided facility;add bike lanes and sidewalk from NC 54 to Old Hillsborough <br /> Road/Trolling wood Hawfields Road. <br /> ➢ Widen Mattress Factory Road to a four-lane, divided facility;add bike lanes and sidewalk from Washington <br /> Street to Rock Quarry Road. <br /> ➢ Realign Mattress Factory Road to allow for safer railroad crossing and improve mobility;extend on a new <br /> location as a four-lane, divided facility with sidewalks and bike lanes. <br /> Numerous pedestrian accommodations are recommended in the Mebane municipal limits.On the US 70 corridor,the <br /> plan recommends a side path from Supper Club Road to Mattress Factory Drive and a wider,paved shoulder to <br /> modernize the roadway,and create a transit corridor from NC 119 to Supper Club Road. <br /> The plan also proposes urban bus corridors throughout downtown Mebane and along US 70 as well as a fixed guideway <br /> transit system along US 70 east of Third Street. <br /> 96 US 70 Multimodal Corridor Study Existing Conditions Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.